Location: Yonkers, NY
Project Detail:
• Oil Terminal Demolition
• Two 600' Piers Removed
• Install 250' of 65' Steel Sheet Piling
Location: Astoria Queens, Hell Gate
Project Detail:
• Install 355' of 60' Steel Sheet Piling
• Backfill 1,000 tons of 3" stone
• Concrete Cap
Location: East River, NY
Project Detail:
• Install 900' of Concrete Seawall
• Install 400' of Concrete Upland Wall
• Backfill 2,600 cubic yards
• Install 10,000 tons of Granite Rock Revetment
• Construct 300' of Timber Pier
Location: East Rockaway, NY
Project Detail:
• Remove and replace ~1,300' of Failing Bulkhead
• Install 1,300' of Navy Wall Style Bulkhead
• Design and construct 10,000 square foot Floating Docks and Marina
• Design and install 780 40 ton Helical Piles
Location: Eleuthra, Bahamas
Project Detail:
• Place 100,000 yards of Clean Fill
• Place 62,000 tons of Base Stone
• Place 182,000 tons of 8-ton Concrete Bollard Boxes