2025 Mid-Bay Chesapeake Barren Island Ecosystem Restoration Location: Mid-Bay Chesapeake Barren Island $40 Million Project to restore 4,600 foot breakwater Transform 2,100 acres of open water into dry land create up to 83 acres of wetlands behind the new barrier walls
2024 Mattituck Harbor Dredging Location:Mattituck Long Island, New York $3 million project to dredge Mattituck Harbor Removal of 9,985 cubic yards of sediment Last dredged in 2014, resulting in 100,000 cubic yards of sand being added at Baillie Beach Park
2018 Avalon Bay Yonkers Location: Astoria Queens, Hell Gate Install 355' of 60' Steel Sheet Piling Backfill 1,000 tons of 3" stone Concrete Cap
2017 Steel Sheet Piling Wall Location: Astoria Queens, Hell Gate Install 355' of 60' Steel Sheet Piling Backfill 1,000 tons of 3" stone Concrete Cap
2016 Concrete Wall and Rock Revetment Location: East River, NY Install 900' of Concrete Seawall Install 400' of Concrete Upland Wall Backfill 2,600 cubic yards Install 10,000 tons of Granite Rock Revetment Construct 300' of Timber Pier
2016 The Beechwood Organization Location: East Rockaway, NY Remove and replace ~1,300' of Failing Bulkhead Install 1,300' of Navy Wall Style Bulkhead Design and construct 10,000 square foot Floating Docks and Marina Design and install 780 40 ton Helical Piles
2016 Breakwater Location: Eleuthra, Bahamas Place 100,000 yards of Clean Fill Place 62,000 tons of Base Stone Place 182,000 tons of 8-ton Concrete Bollard Boxes